Cross Yarra Partnership

Numerous Projects completed and ongoing for Metro Tunnel Project

AGL Loy Yang Power

• Sub-Contractor to Alstom for Unit 1 Generator Overhaul
• Fabrication major items used to aid the rebuilding of Generator at Loy Yang B
• Deluge Valve relocation Units 2 & 4 – bunkers & precipitators
• Fabrication PF Burner ducts
• Final assembly, machining, painting & delivery Dredger 16 Bucket Wheel.

CPB Contractors & Lend Lease Engineering JV

Victorian Crossing Removal Project

CPB Contractors & John Holland JV

Metro Tunnel Project – Design, supply & commissioning of Lifting Beams

Thiess Pty Ltd

Warragual Railway Station Upgrade

CB&I

Longford Gas Conditioning Plant – Offsite Module Fabrication & Underground Piping
• Fabricate and deliver underground piping, approximately 10,000 dia-inch
• Fabricate and assemble 42-off pressure piping and process modules for transport and delivery
to site.
• Completion and supply of comprehensive Fabrication Records Books.
• Peak workforce of 100, 2 shifts x 6 days per week.
• Multi-disciplinary workforce – Fitting, welding, rigging, electrical.

SP Ausnet

• Shop detail, supply, fabricate, trial assemble, galvanise and deliver electrical transmission towers and structures.

Hazelwood Power Corporation Ltd.

• Overhaul of Main Mill, FD Fan and ID Fan Motor Coolers.
• Overhaul of Rotary Air Heater Heat Exchangers.
• No: 5 Boiler – Re-welding of Drum Downcomer and Economiser nozzles. Machining and Overhaul of Drum and Boiler safety valves.
• Fabrication of Precipitator Ash Hoppers for units 8.
• No.1 Boiler Superheater Inlet Header.
• Manufacture of Unit 1 Condensate and Cooling Water lines.
• Supply of 1800m 750NB Open cut Ring main Pipeline.
• Supply of Gas Ducts stainless steel expansion joints.
• Redesign and supply of Slide Gate Valve for ash discharge.
• Slot Bunker Upgrade – Replacement of chutes & trouser legs on conveyors 191, 192, 193, 194, 195 and 196
• Installation of positive drive system on travelling conveyors at Hazelwood Raw Coal Bunker.
• Fabrication and installation of Sensor Platforms at coal bunker
• Fabrication Travelling Tripp

Murray Goulbourn Milk Factory

• Maffra – New Boiler installation, steam condensate and gas pipe installations.

David Brown Pty Ltd

• Pt. Kembla Steel Processing Plan – Structural steel cones and supports structure.

Hazelwood Power Corporation Ltd.

• Overhaul of Main Mill, FD Fan and ID Fan Motor Coolers.
• Overhaul of Rotary Air Heater Heat Exchangers.
• No: 5 Boiler – Re-welding of Drum Downcomer and Economiser nozzles. Machining and Overhaul of Drum and Boiler safety valves.
• Fabrication of Precipitator Ash Hoppers for units 8.
• No.1 Boiler Superheater Inlet Header.
• Manufacture of Unit 1 Condensate and Cooling Water lines.
• Supply of 1800m 750NB Open cut Ring main Pipeline.
• Supply of Gas Ducts stainless steel expansion joints.
• Redesign and supply of Slide Gate Valve for ash discharge.
• Slot Bunker Upgrade – Replacement of chutes & trouser legs on conveyors 191, 192, 193, 194, 195 and 196
• Installation of positive drive system on travelling conveyors at Hazelwood Raw Coal Bunker.
• Fabrication and installation of Sensor Platforms at coal bunker
• Fabrication Travelling Tripp

Transfield Fabrication

• Energy Brix Australia – Fabrication of Mill Ducts.

Energy Brix Australia Corporation Pty Ltd

• Briquette Receivable System (Pneumatic) – Manufacture, Installation and Commissioning -Colac.
• Fabrication of Mill Duct and Mill Casing.
• No. 4 Turbine – (4) four yearly overhaul.
• B251 Conveyor Expansion Roller replacement.
• ‘B’ Factory Press Cooling Water Line replacement.
• Bunker beam replacement all eight Boilers

W.M.C.

• Collar Hoppers for O.E.P. (Fabrication & Welding of 25, 32 & 50mm Plate)

E.P.T. Limited

• Fabrication and Mechanical Assembly, Delivery, Installation of Conveyor Intermediate Units and Components.

Supaflo Technologies Pty Ltd

• Installation of Energy Brix Australia Sludge Thickener Plant pipe work, Pumps and all Valving.

Thiess Contractors Pty Ltd

• Fulham Correctional Centre, Sale – Supply and Fabricate Structural Steel. ICI Chorine & Derivatives
• Manufacture of H.P.C Carbonation Plant Structural Steel.

Yallourn Energy

• Sub-Contractor to G.E.C. Alstom on all Major outages for Unit 1,2,3 & 4
• Replacement of Pressure Steam valves and all pressure welding requirements
• Supply, fabrication, galvanising, assembly and delivery of total of 655 conveyor units between 2005 and 2008.

Loy Yang Power

• Feedpump Crane 1, 2, 3 & 4 Static Line Installation

Australian Paper

• Annual Overhaul of the Pine Kraft Processing Plant.
• Chemical preparation area pipe bridges 3 & 4

ABB Power Generation

• Fabrication of Unit 7 Precipitator Ash Hoppers for Hazelwood Power
• Fabrication of Unit 3 Eaves and Walls

Mitsui Babcock

• Fabrication of Unit 7 Boiler casing panels for Hazelwood Power.

Siemens Limited

• Replacement of Turbine Bellows at Loy Yang ‘A’ 4 x 500 megawatt Power station – Unit 4
• Replacement of LP 1 & 2 Turbine Inlet & Outlet Steam Bellows at Loy Yang “A” – Unit 3
• Removal & Re-installation of Cooling Tower Splash Pack at Loy Yang “A” Unit 3
• Overhaul Circulating Water System components at Loy Yang “A” Unit 1
• Fabrication of major items (150 tonne) used to aid in the rebuilding of generator at Loy Yang B. Job was started within 24 hours of call and finished within 3 weeks.

Silcar Ltd

• Overhaul Circulating Water System components at Loy Yang “A” Unit 3

The Reinforced Earth Company

• Morwell River Diversion Conveyor Tunnel Arch Sections- Supply, manufacture and deliver 1,118 precast concrete arch segments (8,500 tonne) to Yallourn Mine.

Clough Engineering Limited – Bassgas Project, Lang Lang

• Fabrication, assembly & processing of pipe rack skids for Packages 1, 4, 5 & 6 & Fire Service. This from a total of 8 packages.

Shedden Udhe – Mobil Altona Clean Fuels Venture

• Piperack Pre-assembled Units 3405 & 3406
• BRU Structure Pre-assembled Units 3401,3402, 3403, 9101 & 3701

Powercor Australia Ltd- Basslink Project

• Supply, fabrication and surface treatment of steelworks for LYPS 500kV Terminal Station.
• Supply, fabricate and deliver Platforms, CVT supports, Transformer bases and associated items – Brunswick Terminal Station
• Supply and fabrication MLD Tower steel – Moorabool Terminal

Outokumpu Technologies Pty Ltd

• Supply, fabrication and delivery 1 x 22m Ash Thickener Tank and all components for Hazelwood Mine.
• Fabrication of 8m & 14m tanks for Avebury Nickel Project Zeehan Tasmania
• Supply, fabrication, stress relieve and deliver 2 off rake drive units Avebury & Bolga.

Thiess John Holland – Eastlink Project

• Supply, Design/Drafting & fabrication of Pre- Cast Concrete Panel Moulds, Transport Frames & miscellaneous steel fabrications

Port of Melbourne – Channel Widening Project

• Supply and fabricate HBMS Steel plates.
• Modification to Ripper Dragheads.
• Modification of Sweeper Bar

Loy Yang Power – D16 Bucket Wheel Boom Forechute

• Supply, fabricate and paint.
• Supply and fit out HMWPE wear plates.

International Power Hazelwood – Main Mill Classifiers

• Supply, fabricate and paint SS Classifiers

Australian Paper Maryvale – M5 Steam Pipe Upgrade

• Supply, fabricate and install pipe spooling.

Thiess Degremont

• RO Pipe Rack Modules 7, 8, 10 & 11 Victorian Desalination Plant