- (03) 5133 9955
- admin@stableengineering.com.au
Numerous Projects completed and ongoing for Metro Tunnel Project
Victorian Crossing Removal Project
Longford Gas Conditioning Plant – Offsite Module Fabrication & Underground Piping
• Fabricate and deliver underground piping, approximately 10,000 dia-inch
• Fabricate and assemble 42-off pressure piping and process modules for transport and delivery
to site.
• Completion and supply of comprehensive Fabrication Records Books.
• Peak workforce of 100, 2 shifts x 6 days per week.
• Multi-disciplinary workforce – Fitting, welding, rigging, electrical.
• Shop detail, supply, fabricate, trial assemble, galvanise and deliver electrical transmission towers and structures.
• Overhaul of Main Mill, FD Fan and ID Fan Motor Coolers.
• Overhaul of Rotary Air Heater Heat Exchangers.
• No: 5 Boiler – Re-welding of Drum Downcomer and Economiser nozzles. Machining and Overhaul of Drum and Boiler safety valves.
• Fabrication of Precipitator Ash Hoppers for units 8.
• No.1 Boiler Superheater Inlet Header.
• Manufacture of Unit 1 Condensate and Cooling Water lines.
• Supply of 1800m 750NB Open cut Ring main Pipeline.
• Supply of Gas Ducts stainless steel expansion joints.
• Redesign and supply of Slide Gate Valve for ash discharge.
• Slot Bunker Upgrade – Replacement of chutes & trouser legs on conveyors 191, 192, 193, 194, 195 and 196
• Installation of positive drive system on travelling conveyors at Hazelwood Raw Coal Bunker.
• Fabrication and installation of Sensor Platforms at coal bunker
• Fabrication Travelling Tripp
• Overhaul of Main Mill, FD Fan and ID Fan Motor Coolers.
• Overhaul of Rotary Air Heater Heat Exchangers.
• No: 5 Boiler – Re-welding of Drum Downcomer and Economiser nozzles. Machining and Overhaul of Drum and Boiler safety valves.
• Fabrication of Precipitator Ash Hoppers for units 8.
• No.1 Boiler Superheater Inlet Header.
• Manufacture of Unit 1 Condensate and Cooling Water lines.
• Supply of 1800m 750NB Open cut Ring main Pipeline.
• Supply of Gas Ducts stainless steel expansion joints.
• Redesign and supply of Slide Gate Valve for ash discharge.
• Slot Bunker Upgrade – Replacement of chutes & trouser legs on conveyors 191, 192, 193, 194, 195 and 196
• Installation of positive drive system on travelling conveyors at Hazelwood Raw Coal Bunker.
• Fabrication and installation of Sensor Platforms at coal bunker
• Fabrication Travelling Tripp